1. Dear Asha, The best thing is

Dear Asha,


The best thing is to construct the house on piles elevated such that the floor is 0.5 m above maximum flood level ever known and the floor itself being the capping beam of the piles. The toilet sewage is to go through a septic tank followed by upflow filter and this also resting on piles. This is also a costlier method. Otherwise, fill the building area with boulders of stone and a retaining stone wall around and build the house.


Regards


Dr. S. Sundaramoorthy
Technical Advisor (ex-Engineering Director of Chennai Metropolitan Water Supply and Sewerage Board)
Creative Environmental Consultants
Chennai, Madras
Kuty

Reply

The content of this field is kept private and will not be shown publicly.
CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.
8 + 5 =
Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.
Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 2.5 India License.